Works going on

Land/bathymetric surveys and marking out of completion works of docks in the north river basin of Gioia Tauro port.

Plan of environmental clean-up of degraded quarries so used for the final warehousing of materials taken from the work of completion of the road Catania- Siracusa.

Surveys 2D/3D for the completion of the project and for the polygonal mark for the building of these micro tunnels: Monte Castelluccio, Piana di Comi, Pizzo Sughero and Castello di Margi and for the building of the Montalbano Elico (ME)-Messina DN 1200 (48") methane pipe-line that is under construction to.

Polygonal mark, marking out and service in the perforation of Monte Catanesi and Poggio Scudeddaro tunnels and of Montalbano Elicona (ME)-Messina lot A e B methane pipe-line.

Engineering services that concern the all running and definition of cadastral practices of dispossession, connected with hydraulics-forest settlement works and environmental clean-up of the basin of Gornalunga (En) river, of the basins of Gresti, Rio Secco, Belmontino, Murapano and of the little ones.

Survey service for the enlargement works of Snam Station of Calderari (En)

Survey supervision in the building works of SNAM RETE GAS Capizzi (ME)–Mistretta (ME) DN 500 (20”) methane pipe-line.

Survey service and cartographic update for the “AS BUILT” documents of:

  • Mazara del Vallo (TP)-Messina DN 1200 (48") SNAM RETE GAS methane pipe-line; lots Mazara del Vallo (TP)-Menfi (AG), Montalbano Elicona (ME)-Messina.
  • Gagliano Castelferrato (EN)-Sparacollo (EN) DN 400 (16") methane pipe-line
Works going on Works going on Works going on